Featured
Home #2 Laguna
Above,
before, and to right, after. when soldered copper is new, wild discoloration
from heat should be expected for a few weeks. Within two months all color evens
out a weathering begins.
These
roof areas were tied together and routed into a leaderhead placed [ painfully
] behind the manzanita bush. Copper counter flashing was installed throughout
the house as there was no drip edge to begin with. If there is any rule of thumb
about gutter installation it is that there must be proper roof flashing for
everything to work and the gutters must stay behind that flashing no matter
what.